Monday, 15 July 2013

ere is the mezzanine sleeping deck with placo in place and the wood in the office painted to colour. You can see where electrics and fittings are to be finished off. 

Image


Image


There will be a door through here made of the same wood into the storage area.


Image


Image

The hidden stairwell up to the sleeping deck 

Image



This shows the outside wall in the office now insulated with 75mm Quinntherm behind and placo in place/. 
The V shaped gap above the wall and below the roof is stuffed with insulation of all sorts. 


Image


Image

This shows the sort of hidden stairwell in the office that leads up to the sleeping deck. I was going to do a sort of James Bond bookcase that slid away to reveal the stairs but MrsB quite rightly suggested that it would be the worst kept secret in history as I would forever be showing it to people. :lol: 


Image


All of the exposed wood beams in this area will be painted the grey colour as it complements the slightly reddish hues of the chestnut floor and douglas fir paneling. 
It will be the same in the shed room as well.


It is a joy to see parts of it coming together to look more house like rather than building site.
Still a long way to go but slowly and surely we are getting there.